Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2011 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 08/29/2011 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEMPERATURE AND PRESSURE RELIEF DRAIN TO TERMINATE 24" MAX FROM FINISH GRADE TO PREVENT SCALDING 2) PROVIDE 6" MINIMUM CLEARANCE FROM SINGLE WALL VENT CONNECTOR AND COMBUSTIBLE INSULATION 3) SEAL POTABLE WATER PIPING ON EXTERIOR OF ENCLOSURE INSULATION TO PROTECT FROM FREEZING 4) PROVIDE MINIMUM 1" CLEARANCE FOR DBL WALL VENT THRU ROOF AND COMBUSTIBLE WOOD ROOF STRUCTURE 5) PROVIDE LADDER ON SITE FOR ROOF TOP INSPECTION AS REQUIRED AT ALL SITES 6) LIST NOT COMPLETE 7) CONTRACTOR TO PAY REINSPECTION FEE PRIOR TO FINAL |