Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T11CM02234

Parcel: 131113410


Addresses:

5726 E 35TH ST

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
08/18/2011 BUILDING - FINAL Approved IVRS - Inspection :*
07/29/2011 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) VENT CONNECTORS ARE INSTALLED OPPOSITE OF THE CORRECT DIRECTION OF FLOW
2) SUPPORT SUPPLY PIPING, HOT & COLD AND SUPPORT TUBING
3) NOT INSTALLED AS SHOWN ON APPROVED OG-300 DIAGRAM; REMOVE CROSS CONNECTION AND INSTALL PER PLAN
4) REPLACE KINKED WATER FLEX
5) COMPLETE ALL REQUIRED CORRECTIONS, SEAL AND SECURE FLASHINGS, TRAVEL DOWN YOUR BEAD. REMOVE J HOOKS FROM ROOF AND PATCH. EXTEND B-VENT TO 1' ABOVE ROOF
6) CONTRACTOR SHALL PAY REINSPECTION FEE FOR FAILING TO COMPLY WITH NOTED CORRECTIONS
07/20/2011 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) REPLACE DAMAGED GAS FLEX AND INSTALL MISSING COVER
2) SUPPORT ALL PIPING AND TUBING WITH CODE APPROVED PIPE SUPPORTS
3) ALL JOINTS OF COPPER TUBING SHALL BE MADE AS PRESCRIBED BY CODE; REAM ALL JOINTS AND REMOVE EXCESS FLUX
4) PROVIDE A 3" X 4" INCREASER AND REMOVE TAPE AT B-VENT CONNECTION. CORRECT POINT OF TERMINATION MISSING SEDIMENT TRAP
5) PIPE RELIEF DRAINS TO AN APPROVED LOCATION
6) PROVIDE SOLID SUPPORTS UNDWER WATER HEATERS OR REMOVE AND SET ON FLOOR
7) PATCH NAIL HOELS ON ROOF AND SUPPORT TUBING
8) INSTALL FLASHINGS PROPERLY, SECURE AND SMOOTH BEAD