Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/09/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/11/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT 2) WATER HEATER VENT CONNECTOR TO BE INSTALLED WITH NO HOLES IN IT 3) PLUMBER TAPE IS NOT APPROVED FOR HANGING SUPPORT OF PIPING 4) BLOCKING ON ROOF TO BE MAKE WEATHER TIGHT IF NAILED DOWN THRU ROOF SURFACE. PROVIDE MINIMUM 6" CLEARANCE FOR COMBUSTIBLES AND SINGLE WALL VENT CONNECTOR 5) PROVIDE WEATHER TIGHT SPLICE FOR SENSOR CONTROL WIRE ON ROOF 6) INSULATION ON POTABLE PIPING ON ROOF TO BE PROPERLY SEALED TO PROTECT FROM FREEZING AND UN-DAMAGED 7) CONTRACTOR TO PAY REINSPECTION FEE, PRIOR TO FINAL |