Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/04/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) TRANSITION GLUE MAY NOT BE USED, PROVIDE AN APPROVED COUPLING AT FC VENT AND HS AAV. 2) CORRECT LEAK AT PROP SINK FAUCET 3) PROVIDE MINIMUM 1" AG AS REQUIRED 4) SUPPORT MIXING VALVE AT H.S.'S 5) CONNECT DW WATER SUPPLY AS SPECIFIED ON APPLIANCE INSTALLATION INSTRUCTIONS 6) ALSO PROVIDE A 1" AIR GAP FOR COMMERCIAL DW DRAIN TERMINATION 7) INSTALL CLIPS ON HS 8) BACKFLOW CERTS 9) PROTECT VTR |