Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2011 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/07/2011 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER WALTER |
|
| 09/06/2011 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 08/29/2011 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER WALTER |
|
| 08/23/2011 | FRAMING | Not ready for Inspection | 1. WORK NOT COMPLETE ENOUGH TO INSPECT 2. ADD ELECTRICAL UPGRADE TO PERMIT 3. PROVIDE RISER DIAGRAM ON PLAN |
|
| 08/22/2011 | FRAMING | Denied | COMPLETE ITEMS ON LAST INSPECTION AND COMPLETE INTERMEDIATES | |
| 08/18/2011 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE TRADES TO INTERMEDIATE STAGE 2) PHYSICAL PROTECTION NEEDED ON CONDUCTORS BELOW 1 1/4" OF NAILING SURFACE 3 X 2'S, CONDUCTOR HANGING FROM HALL CEILING 3) MINIMUM 18" TO P-TRAP OF WASHER BOX, NAIL PROTECT PLUMBING PIPES WITHIN 1 1/4" OF NAILING SURFACE PLUMBING STUBBED OUT OF WALLS 4) FINISH RUNNING DUCT WORK FOR MICROWAVE AND HALL DUCT |
|
| 08/17/2011 | FRAMING | Denied | IVRS - Inspection : There is no access to the site.| 920* |