Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2011 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 11/21/2011 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WATER HEATER PRESSURE RELIEF VALVE CANNOT USE FLEX PIPE AND IT CANNOT GO UP. IT HAS TO BE PITCHED FOR DRAINAGE 2) ABS DRAIN LINES, OUTSIDE OF HOUSE, MUST HAVE GREEN TRACER WIRE 3) ALL SLEEPING ROOM CIRCUITS MUST BE ARC FAULT PROTECTED 4) FINISH WATER HEATER AND KITCHEN SINK & STOVE 5) FINISH WATER HEATER AND KITCHEN SINK AND STOVE NOTE: HCS IS ACTUALLY NEW 3" ABS TO EXISTING AT WEST SIDE OF SOUTH HOUSE |