Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2011 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 07/08/2011 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTE #2 FROM 6/20/11 INSPECTION HISTORY 2) CONTRACTOR TO PAY REFEE PRIOR TO FINAL NOTE: PEX TUBING IS CONSIDERED COMBUSTIBLE UNLESS YOU CAN PROVIDE LISTING VERIFYING OTHER WISE |
|
| 06/20/2011 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE RIDGID FULL SIZE PIPING FOR T & P RELIEF DRAIN (NO FLEX) 2) PROVIDE 6" MINIMUM CLEARANCE FROM SINGLE WALL VENT CONNECTORS AND COMBUSTIBLE MATERIALS, LIKE INSULATION 3) WATER HEATER VENT TO BE DBL WALL TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE WITH APPROVED DBL WALL VENT CAP |