Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2011 |
ENGINEERING - FINAL |
|
Approved |
PER SIGNED INSP CARD |
| 08/18/2011 |
ENGINEERING - FINAL |
|
Approved |
|
| 08/17/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
CONTRACTOR NOT READY, WILL RESCHEDULE INSPECTION AT A LATER DATE. |
| 08/16/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
CREW WORKING ON THE WALL REMOVAL AT THIS TIME, THE INSTALLATION OF THE DOOR WILL BEGIN ONCE ALL OF THE DEMO MATERIAL IS FULLY REMOVED. ANTICIPATED RE-INSPECTION OF THE SITE TOMORROW. |
| 08/15/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
PARTIAL TO REMAIN IN PLACE TILL ALL OF THE WORK ON THE NEW DOORWAY IS COMPLETE, CURRENTLY THE EXISTING WALL IS STILL IN PLACE. |