Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 08/31/2012 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection :* |
| 08/29/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. Flange OK. 2. 11/2" stub for lavatory OK. 3. Shower liner has ponding, and won't drain completly. |
| 08/28/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. Install 2"x11/2" bushing at lav. waste and stub out 11/2". Install tile under the closet flange. 2. Open the weep holes at the shower drain and test to the threshold. |
| 07/11/2012 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
1. Plumbing intermediate is going to be reopened. 2 Secure the closet flange to the finished floor. 3. Call for shower pan inspection- refer to the hand out. Call for inspection when tyhe installer can be present. 4. Remove the 2" stub out for the lavatory, and install a one and a half inch bushing with an inch and a half stub out. 5. Missing screw on sheet rock. |