Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2011 | FIRE SPKLR - FINAL | Approved | ||
| 11/14/2011 | FIRE SPKLR - FINAL | Denied | 1. Lower head in Crypto & Merlin Room head is above ceiling tile. 2. In main electrical room add drop coverage, plans show no drop ceiling when there is a drop ceiling added. 3. In the southeast corner of the building there is a storage room (called out on plans) with a head that is 8 feet off a wall not allowed needs to be 7 feet 6 inches or less. |