Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/28/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) RESTROOMS 157, 158, 131, 132, 151 AND153 CLOSET FLANGES OK |
|
| 10/20/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) YARD PIPING FOR 03030 OK EXCEPT TIE INTO NEW WATER HEATER |
|
| 09/30/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 09/29/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NO CLOSET FLANGES 2) LOW PRESSURE AIR TEST FOR GAS REQUIRES YOU TO USE A 15 POUND GAUGE IN 1/10 POUND INCREMENTATION 2) NO PORTION OF ANY WORK MAY BE CONCEALED UNTIL IT HAS BEEN INSPECTED AND APPROVED |
|
| 09/09/2011 | PLUMBING - INTERMEDIATE | Partial Approval | 1) PVC DWV THRU ROOF OK 2) WATER TEST OK 3) OK TO FINISH INSULATION 4) NEED TO SEE CLOSET FLANGES |
|
| 09/07/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 09/06/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) CAP OFF ALL OPEN PIPES 2) BLDG #2 MENS TOILET AND LOCKERS (EAST HALF) OK TO COVER 3) BLDG #1 SOUTH RESTROOMS-OK TO COVER WALLS |
|
| 09/01/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) DWV THRU ROOF WATER TEST 157,158,105 AND 106 OK 2) WATER IN WALL AND OVER HEAD SAME AREAS 157, 158, 105 AND 106 OK |
|
| 08/30/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ISOLATE PVC FROM METAL STUDS 2) THERE ARE MULTIPLE BLDGS ON THIS SIDE-POST YOUR BLDG NUMBERS 3) THIS INSPECTION IS FOR BLDG #1 4) RESTROOMS #151,152 AND 153 OK TO COVER WALLS ONLY |
|
| 08/29/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) NO TEST ON PVC-NOT SUPPORTED OR PROTECTED 2) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP THAT WILL ALLOW 1/4 BEND ON 2" X 4" WALL FOR LAVS 3) SUPPORT ALL HORIZONTAL PIPE 4) PROTECT PVC PASSING THRU METAL STUDS 5) SUPPORT ALL VERTICAL PIPE 6) FIX THE LEAKS |