Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T11CM01609

Parcel: 13613001U

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESS TEST FNL

Date Description Inspector Results Comments
04/18/2012 PLUMBING - GAS PRESS TEST FNL Approved IVRS - Inspection :*
04/16/2012 PLUMBING - GAS PRESS TEST FNL Not ready for Inspection IVRS - Inspection :*
1) NOT INSTALLED PER PLAN. DRAWING SHOWS DECK DRAIN INSTALLED DIRECTLY OVER P-TRAPS
2) FOR THE THIRD TIME ON THIS JOB-FURNCO COUPLINGS ARE NOT ALLOWED INSIDE THE BLDG. PROVIDE A SHIELDED TRANSITION COUPLING
2) PROVIDE PROPER ALIGNMENT AND SLOPE
3) CLEANOUTS REQUIRED AFTER 45 DEGREE
4) DRAINAGE FITTINGS REQUIRED AT VERTICAL TO HORIZONTAL CHANGE OF DIRECTION