Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2012 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 01/17/2012 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | UG pressure test at 200 PSI approved for 260 feet of 4" and 6" C900 at the Andrada Poly-Tech on S/W corner (auto shop and storage). | |
| 12/06/2011 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | 10" stainless steel stub and 10' C-PVC with bolt clamps and thrust block approved okay to bury. Need separate plan and permit for sprinkler and underground piping for fire systems need separate for all systems that are checked off on front of approved plans. |