Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/11/2011 |
ENGINEERING - FINAL |
|
Approved |
SEWER REPAIRS ON SOUTHSIDE BEING DONE. PAAL IS BEING MAINTAINED & REPAIRS BLOCKED OFF BY BARRICADES & CONSTR. RIBBON. |
| 09/21/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
Install curb per approved plan from the end of the access ramp to the driveway approach at ROW. Install vertical curb now or wait for paving by city and install extruded curb. |
| 09/19/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
Install curb per approved plan along HC access from ROW at driveway approach. |
| 09/09/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
OK for Temp C of O, need to finish install of LS based on approved plan. Remove all const. debris. Install curb at entrance when paving on Kolb is complete, |
| 08/05/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
CONTRACTOR HAD SOME QUESTIONS ABOUT THE USE OF THE EXISTING ASPHALT IN HIS PEDESTRIAN ACCESS AREAS. SITE IS NOT READY AT THIS TIME BUT WILL BE RECHECKED ON 8/26/11 FOR THE FINAL INSPECTION. |
| 07/01/2011 |
ENGINEERING - FINAL |
|
Partial Approval |
FINAL NOT TO BE INSPECTED TILL ALL EXTERIOR WORK IS COMPLETE TO ENSURE PEDESTRIAN SAFETY. |