Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/10/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) TEMP HB REQUIRES VACUUM BREAKER 2) CAP ALL OPEN DRAIN PIPING 3) FAILURE TO COMPLY WITH BASIC SAFETY REQUIREMENTS MAY RESULT IN REINSPECTION FEES 4) ABS INSTALLED WITH TEST TO ABOVE CEILING HEIGHT, PLAN SPECIFIES CAST IRON 5) DOMESTIC WATER AT TOILET ROOMS NOT SIZED PER PLAN 6) FLOOR MOUNTED CARRIERS SPECIFIED |