Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) REVISION ON SITE WITH WATER TEST OK |
|
| 07/21/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) UNDERGROUND ONLY: WATER TEST THRU BLDG PER RED LINE ON SITE. TO JUST BEFORE 2-WAY CLEANOUT. INSTALL PER APPROVED PLAN OR PROVIDE PROOF OF BACKWATER VALVE NEEDED. IF NEEDED THIS PROJECT WILL REQUIRE 2ND 4" BLDG DRAIN FOR 2ND LEVEL. THIS WILL REQUIRE RE-TEST ON UNDERGROUND FOR INTERMEDIATE CLEANOUTS NOT INSTALLED AT THIS TIME AND RE-TEST IF BACKWATER VALVE IS REMOVED |