Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2011 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 06/20/2011 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SINGLE WALL VENT COUNTER REQUIRES 6" MINIMUM CLEARANCE FROM COMBUSTIBLES (INSULATION, WOOD) AND NO HOLES IN VENT PIPING 2) PROVIDE DBL WALL VENT THRU CEILING ROOF STRUCTURE TO POINT OF TERMINATION AT APPROVED VENT CAP 3) PROVIDE CONCRETE OR CEMENT BLOCK UNDER WATER HEATER NOT WOOD AND GALVANIZED NIPPLES TO LEVEL WATER HEATER 4) ELECTRICAL WIRING FOR NEW ELECTRICAL OUTLETS TO BE IN APPROVED CONDUIT 5) PROVIDE UPPER COMBUSTION AIR OPENING |