Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2012 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 04/30/2012 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1 NO POWER TO OUTLET ON PATIO 2) GFI IN BATHROOM DOES NOT RESET 3) SUPPORT PEX TO MANUFACTURE SPECS 4) SET SCREW NEEDED IN VACUUM BREAK AT HOSE BIBS 5) SEAL TOILET BASE AT FLOOR 6) FUSES NEEDED AT A/C DISCONNECT |