Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T11CM01448
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2013 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
01/25/2013 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | contradctor cancelled | |
01/04/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
01/02/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 4 DRILLED SHAFTS (DSI) GL: EC6-EC.9 OK TO POUR PROGRESS | |
11/27/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | NORTH RAMP FOOTING: D.5-J.5 OK TO POUR FOOTING; 6@ F1 COLUMN/ FOOTINGS; PLANTER/RETAINING WALL FOOTINGS- TO BE CHECKED BY SPECIAL INSPECTION | |
11/15/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | north site wall footings ramp footings ok to pour progress areas | |
11/07/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | INFORMATION- WEST RAMP: LANDING REQUIRED AT 30' LENGTH; HANDRAILS (RAMP WIDTH 8'4") OVER- FLOW SCUPPERS LOCATED IN RAMP AREA; NEED TO MOVE OR ROUTE UNDER RAMP. | |
05/03/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) GRADE BEAM AT GL: M/1-1.6; M.25/0.25-1 OK TO POUR PROGRESS AREA |
|
05/01/2012 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
04/30/2012 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
04/27/2012 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
04/03/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) GRADE BEAM #11 GL: C/0-3 OK TO POUR BEAM |
|
03/20/2012 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 9 GRADE BEAMS AT GL: 1/B,C,D,E,F; 1/J,K; A/4-5 OK TO GROUT GRADE BEAMS |
|
01/27/2012 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED |
|
12/22/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
12/19/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
12/15/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ||
12/14/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER CONTRACTOR |
|
12/13/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED DUE TO RAIN |
|
12/12/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED-RAINED OUT |
|
12/09/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) NORTHWEST STAIRWELL: GL A.5/8-B.5/8; B-5/8.5-A.5; A5/8.5-A.5/A, GRADE ROOM #10: GL 1/A-H OK TO POUR PROGRESS AREAS |
|
12/08/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) GRADE BEAM, GL C/8-K/8 OK TO POUR, ELECTRIC ROOM WALLS AT 44"-GL: 6/A-B; B/6-8 OK TO POUR WALLS |
|
12/07/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) RAMP FOOTING: GL: .5A/1.8-5.25 OK TO POUR FOOTING |
|
12/06/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) ELEVATOR WALLS #1-6, PER DETAIL #1/S500 AND 2/S502 2) NEED CLARIFICATION FOR ANCHORING SYSTEM FOR S8 DIVIDER BEAMS-PAGE 7 OF 15 ELEVATOR DRAWINGS-OK TO POUR PROGRESS AREAS |
|
12/05/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED |
|
12/02/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) GRADE BEAM #5: GL 8/K-K.8 |
|
12/01/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) GRANDE BEAM AT GL: 7/K-K.8; 4-CAPS AT GL: K/4-7; ELECTRIC ROOM 8" FOUNDATIONS: GL: 6/A-B, B/6-8 OK TO POUR PROGRESS AREAS |
|
11/30/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) ELEVATOR MATTS FOR #1 & 2 OK TO POUR |
|
11/29/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED |
|
11/28/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) ELEVATOR PADS #5 & 6; SHORT 1 EACH #8 BAR PLAN CALLS FOR 29 #8'S SET UP WILL ONLY ALLOW FOR 28: RECOMMEND; PEDESTALS: AT E/1, F/1, G/1 AND H/1 OK TO POUR PROGRESS AREAS |
|
11/24/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ELEVATORS 3&4 MATT AS PER DETAILS, PAGE WP R-2 CAISSON FOOTINGS: DS-2 AT K/8, DS-1 AT K.5/8, DS-3 AT K/7, DS-1 AT K.5/7, DS-3 AT K/6, DS-1 AT K-5/6 OK TO POUR PROGRESS AREA |
|
11/22/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CAISSON FOOTINGS (2) DS-1 AT 5/K.8, L; PEDESTALS AT GL: 8/A, C, D, E, F AND G; CAPS AT GL: H/8 AND J/8 OK TO POUR PROGRESS ARES |
|
11/21/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 4 CAISSON FOOTINGS GL: DS-2 AT H/8, J/6, J/1; DS-1 AT H.2/O.2-OK TO POUR PROGRESS AREAS |
|
11/18/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 9 CAISSON COLUMN FOOTINGS: DS-2 AT B/6; DS-2 AT B/5; DS-1 AT B/4; B/3, B/12; DS-2 AT B/1, C.1; DS-1 AT C/0.3 AND DS-2 AT D/1 |
|
11/18/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1) CAISSON FOOTINGS: GL: DS-4 AT A.4/2.4; DS=4 AT A.4/1.6; GL: DS-3 AT 1/D,F,G; DS-2 AT 1/H; K/1, L/1; DS-2 AT J/8, DS-1 J/7; H/7; PIER CAPS: GL: A/3,4,5,7; GL: 8/C,D,E,F,G-OK TO POUR PROGRESS AREAS | |
11/16/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CAISSION COLUMN FOOTINGS: GL: A/1 DS-2, A/1-6 DS2, A/2.4 DS-2, A/3 DS-3, GL: 7/B DS-1, 7/C,D,E DS-2, 7/F, G DS-1 OK TO POUR FOOTING |
|
11/15/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CAISSON FOOTINGS AT GL: DS-3 AT E/8, DS-3 AT 8/F, DS-2 AT G/8, DS-3 AT A/7, DS-3 AT A/3 & 4 OK TO POUR FOOTINGS |
|
11/14/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 3 DS3 CAISSON FOOTINGS GL: K/2-8, 4, 5; 2 DS3-GL: C/8, D/8 OK TO POUR 2) DRILLINGS FOR 11/11/11 DS2 GL: A/8, A/6 AND A5 3) DS1-K.3/2-8, DS1-L/2-8 AND DS1-L/3 POURED |
|
11/10/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) DS4 AT A.5/B.5; DS4 AT B.5/8.5; DS4 AT B.5/8; DS2 AT B/8; 4 AT BD2 AT GL 6/C,D,E,F,FH |
|
11/09/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 10 CAISSON FOOTINGS: DS-3 AT K/2, DS-4 AT K.8/2, DS-1 AT L/2 DS-1 AT K.3/2.8; DF1 AT L/2.8; DS-1 AT L/3; DS-1 AT K.5/3.8; DS-2 AT L/4; DS-4 AT K.5/4.5 DS-4 AT L/4.5 OK TO POUR FOOTINGS |
|
11/08/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CASSION COLUMN FOOTINGS TO GL: 5/C,D,E,F; GL: 5/0G,H,J: GL: 4/J TYPE 2; DS-2; 2 EACH DS-4, TYPE 1 AT GL: 1.8/K.8, L OK TO POUR PROGRESS AREAS |
|
11/07/2011 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED-RAINED OUT |
|
11/04/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CAISSON COLUMN FOOTINGS-11 DS-2 (TYPE-1) GL: F/2, 3, 4; G/2, 3, 4; H/2, 3, 4; I/2, 3 OK TO POUR FOOTINGS |
|
11/03/2011 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CAISSON COLUMN FOOTINGS (DS2 TYPE-1) AT 2C, 3C, 4C, 2D, 3D, 4D, 2E, 3E AND 4E CAGES TO BE PLACED AT COLUMN LOCATIONS OK TO POUR |