Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2012 | ELECTRIC - PROGRESS | Approved | ||
| 01/27/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 01/26/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) DISCONNECTING MEANS AT ? DOOR MOTOR 2) NEED BOND JUMPERS (SAME SIZE) LIGHTING CONDUCTORS 3) FILL UNUSED OPENINGS IN LIGHTS SHOP 4) OK ROOMS #104B; 101 A, B & C; 102-104, 120A, B, C & D; 121, 117, 116, C128, FOR TRIM; 115A, B, C, D, E & F; 118, 119 AND 137; EXCEPT AS NOTED |
|
| 01/25/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) SPACE LED POWER SUPPLIES OFF OF DRYWALL DUE TO HEATING 2) OK 3RD FLOOR TRIM ANNEX "A" 3) OK PVC BOLLARDS IN BRIDGE 4) OK PVC WEST GATES |
|
| 01/23/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 3RD FLOOR: 1) BOND PLUG STRIP BACK PLATE 2) USE APPROVED HARDWARE 3) LOOSE FITTINGS 4) FINISH 3RD FLOOR 5) OK 2ND FLOOR TRIM AREA "A" |
|
| 01/18/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK DISC. SW. FOR FIRE PUMP 2) TRIM 1ST FLOOR AREA "A" 3) OK EAST GATE LOWERED CONDUITS 1 & 3 |
|
| 01/10/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 01/06/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1ST AND 2ND FLOOR: 1) RECEPT SCREWS 406.3 2) FILL UNUSED OPENINGS (VDV BOXES AND CABINETS) 3) FINISH ROOMS NOTE: CORDS NOT ALLOWED ABOVE CEILING 400.7 & 8 |
|
| 01/05/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) BOXES MORE THAN 1/4" OR 1/8" 314.20 AND 21 2) CHECK DISCONNECTING MEANS INSTA HOTS 3) CHECK PLUG MOLD 4) (CLIMATIC) LOOSE FITTINGS 5) BOND BUSHINGS 250.97 6) LABEL DISCONNECTS 7) OK POLE HEAD MAKEUP 42 POLES |
|
| 01/04/2012 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 12/19/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK CADWELDS LIGHTING SYSTEM NORTH SIDE |
|
| 12/13/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) PLEASE CALL LEERAY TO RESOLVE THIS ISSUE, OR RICK HOLLANDER WILL BE BACK THURSDAY 12/15/11 |
|
| 12/07/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
| 11/22/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) AS PER IBC 2702.1.1 GENERTOR IS TO BE LISTED. MODEL NUMBER ON GENERATOR IS NOT ON UL ON LINE CERTIFICATION DIRECTORY. IT APPEARS UNIT DOES NOT COMPLY WITH UL 2200.12.2 AND 12.2.1. A NRTL FIELD TEST MAY BE NECESSARY TO CONFIRM COMPLIANCE 2) OK ROOMS 107, 109, 111, 113, 215 A, B, C, D, F, G, H AND I |
|
| 11/21/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK POLE BASE AS MARKED 2) OK CORRIDOR C112, C113, C103, C117 AND C118 3) OK UFD AND STARTER-HHPP, HHSP AND B1 & B2 |
|
| 11/19/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK PANELS TO MAIN: RPND, RPEM, RPT111A, RPTH1B, RPTFR, T30-101, T3E-101, RIN-B01. L3E, B01, R1E-201, RPS95, RPSQ4, L131-301, RPTR OK BUSS PLUGS AS GREEN STICKER MARKED 2) CLEAN FOREIGN MATERIAL AND DIRT FROM PANELS 3) FILL UNUSED OPENINGS 4) MARKING TAPT TO ENCIRCLE 5) TIGHTEN LUG CONNECTIONS 6) ? UPS RUN UNDER SIZED 7) SECURE UPS ? |
|
| 11/18/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) NEED TO VERIFY GENERATOR LISTING 2) FINISH BOXES MAKE UP 3) OK A3E, A3L 4) OK ROOM 221A, EXCEPT AS NOTED 5) OK POLE BASE AS MARKED |
|
| 11/17/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/10/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) BOX ABOVE GRID 130C 2) OK ROOMS 130C, 130A, 130 B AND 127 3) OK POLE BASE AS MARKED 4) OK LIGHTING AS MARKED |
|
| 11/09/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/08/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/07/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 11/03/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) 5 LIGHT POLES GROUND OK NORTHWEST AREA |
|
| 10/24/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) CORDS NOT ALLOWED ABOVE CEILING 400.7 & 8 2) FINISH BOXES ABOVE DOORS 3) PLEASE VERIFY PLENIUM RATING OT TY WRAPS FOR FIRE ALARM CABLES 4) OK POLE BASES AS MARKED 5) OK ROOMS 141, 104, 136, 135, 106, 133 B & A, 101, 102, 108 A, B, C, F & G AND 110 EXCEPT AS NOTED 6) FINISH VDV |
|
| 10/21/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/19/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) ONLY ONE CONDUCTOR PER TERMINAL AND INSTALL PER INSTRUCTIONS (POLE BASE) 2) FILL UNUSED AREAS AT BOTTOM OF PANELS WITH A NON COMBUSTIBLE 3) TIGHTEN CABLE LASHINGS 4) OK STAIRWELL 2 WALLS, OK STAIRWELL 4 & 3 CAN IN LIDS, OK BATHROOM A105 AND A106, OK PANEL P3E-B01 TO MAIN AND AS MARKED, OK PSN-B01, OK POLE TO POLE AS MARKED AND OK 3 POLE BASES AS MARKED |
|
| 10/17/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) CONDUCTOR TO ENTER VERTICAL SECTION SERVED 408.3 2) WILL NEED GFCI TEST ON ALL 1000 AMP 215.10 3) OK 1" POLE TO POLE AS MARKED |
|
| 10/14/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 10/13/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK POLE TO POLE AS MARKED |
|
| 10/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* OK 1' PVC POLE TO POLE AS MARKED |
|
| 10/03/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/30/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK WALLS C126, 127, 128 & A107 2) 725.8, 760.24, 800.8 & 300.11 WILL APPLY |
|
| 09/29/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK COMMUNICATION DUCT BANK A TO OUTSIDE PULL BOX 100' 2) OK WALLS ROOMS A107 (S), C126 AND 115A-E 3) ANSWERED QUESTIONS FOR WORKING CLEARANCE ELEVATOR DISCONNECTS |
|
| 09/26/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/23/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* OK WALLS C125, 122A & B NORTH & EAST, A-122C OK LV LIGHTING CONDUTER LOBIES 1 & 2 OK COMMUNICATION DUCT BANK A-B |
|
| 09/22/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 09/21/2011 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DISCUSSED SERVICE 2) TIGHTEN LOOSE FITTINGS-CL1MADC 3) AREAS COVERED WITHOUT INSPECTION 3RD FLOOR-UNCOVER 4) INSPECTION STOPPED |
|
| 09/14/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK WALLS VEHICLE SCREENING FACILITY |
|
| 09/06/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/30/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 08/26/2011 | ELECTRIC - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) NEED SUPPORTS THROUGHOUT, SEAL PENETRATIONS THRU FLOORS AND RECALL WHEN READY |
|
| 08/22/2011 | ELECTRIC - PROGRESS | Partial Approval | OK WALLS 141, 123 C & G, C101, C102, 127 | |
| 08/18/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* 1) OK EXCEPT 141, 123 C & G, C101, C102, 127 2) 115 A, B, C AND D ON 1ST FLOOR AREA "A" WALLS |
|
| 07/20/2011 | ELECTRIC - PROGRESS | Partial Approval | IVRS - Inspection :* |