Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2011 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) FLEX GETS INSTALLED AFTER CODE APPROVED GAS VALVE 2) CORRECT ALL PREVIOUSLY NOTED CORRECTIONS 3) INSTALLATION SHALL COMPLY WITH YOUR OG 300 PLAN 4) REMOVE CROSS CONNECTION |
|
| 07/21/2011 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) B-VENT INSTALLED UPSIDE DOWN 2) B-VENT REQUIRED THRU ROOF TO TERMINATION ABOVE COOLER 3) GAS SOV REQUIRES ACCESS 4) ADD SUPPORTS TO PIPING NEAR WATER HEATER CONNECTIONS 5) PROVIDE AN AIR GAP AT T & P TERMINATION INTO DUAL INLET WASHER BOX 6) PROVIDE FLASHINGS AND INSTALL PER LISTING REQUIREMENTS 7) INSULATE IN A WORKMANSHIP LIKE MANOR AS SPECIFIED IN THE INSTALLATION INSTRUCTIONS 8) PATCH NAIL HOLES IN ROOF AND SUPPORT ALL TUBING 9) PROVIDE A CONCRETE OR OTHER APPROVED BASE 10) PROVIDE ACCESS TO DRAIN BACK TANK 11) HAVE A LICENSED ELECTRICIAN INSTALL A CODE APPROVED OUTLET 12) SEAL EXOPSED EDGES OF ENCLOSURE 13) CONTRACTOR SHALL PAY A REINSPECTION FEE FOR FAILURE TO COMPLY WITH CODES AND WORKMANSHIP STANDARDS |