Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2011 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 06/21/2011 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ELECTRICAL WIRING TO MEET 2006 NEC REQUIREMENTS FOR NEW ELECTRICAL OUTLET PER NOTE #3 5/24/11 INSPECTION HISTORY 2) PROVIDE LADDER FOR INSPECTION OF ROOF TOP PER NOTE #6 5/24/11 INSPECTION, SEE NOTE #7 & 8 3) PAY REINSPECTION FEE AT 201 N. STONE PRIOR TO FINAL INSPECTION |
|
| 05/24/2011 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A TEMPERATURE AND PRESSURE RELIEF DRAIN FOR WATER HEATER TERMINATING AT APPROVED LOCATION 2) WATER HEATER DRAFT HOOD TO BE PROPERLY FASTENED AT VENT CONNECTOR JOINTS 3) ELECTRICAL BURING TO BE INSTALLED PER 2006 NEC REQUIREMENTS 4) SECURE ALL TUBING AT CORRECT INTERVALS 5) INSTALLATION TO BE TO OG-300 PIPING DIAGRAM 6) PROVIDE LADDER ON SITE FOR PANEL INSPECTION 7) LIST NOT COMPLETE 8) CONTRACTOR TO PAY REINSPECTION FEE FOR FAILURE TO BE READY FOR INSPECTION |