Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T11CM01408

Parcel: 12813016A


Addresses:

4960 E CALLE JABALI

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
06/27/2011 PLUMBING - FINAL Approved IVRS - Inspection :*
05/20/2011 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) CENTER THE WATER HEATER DRAFT HOOD AND PUT THE LEGS INTO THE HOLES, REMOVE ALL TAPE FROM VENT CONNECTOR AND PROVIDE FASTENERS AT ALL VENT JOINTS
2) INSTALL THE SYSTEM TO THE OG-300 APPROVED PLAN
3) HO WILL YOU SERVICE THE PUMP ASSEMBLY ?
4) BOTH TANKS REQUIRE DRIP PANS AND TERMINATION OF T & P RELIEF TO 1" ABOVE DRIP PAN
5) PROVIDE 6" CLEARANCE FOR SINGLE WALL VENT AND COMBUSTIBLE INSULATION