Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/20/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CENTER THE WATER HEATER DRAFT HOOD AND PUT THE LEGS INTO THE HOLES, REMOVE ALL TAPE FROM VENT CONNECTOR AND PROVIDE FASTENERS AT ALL VENT JOINTS 2) INSTALL THE SYSTEM TO THE OG-300 APPROVED PLAN 3) HO WILL YOU SERVICE THE PUMP ASSEMBLY ? 4) BOTH TANKS REQUIRE DRIP PANS AND TERMINATION OF T & P RELIEF TO 1" ABOVE DRIP PAN 5) PROVIDE 6" CLEARANCE FOR SINGLE WALL VENT AND COMBUSTIBLE INSULATION |