Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 08/31/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) DBL WALL VENT THRU CEILING HAS INNER LINER DEFECTIVE 2) MAKE UP WATER HEATER VENTING CORRECTLY 3) HAVE DRAFT HOOD ORIENTED CORRECTLY 4) THE FURNACE VENT CONNECTION AT THE DBL WALL TO SINGLE WALL IS NOT MADE UP, PLEASE CORRECT THIS ALSO FOR SAFETY AND REMOVE THE TAPE |
|
| 08/29/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) AT WATER HEATER VENT CONNECTIONS NOT MADE UP PROPERLY (CHECK VENT CONNECTOR ON HEATING UNIT) 2) VENT CONNECTORS REQUIRED TO BE MADE UP PROPERLY WITH 3 MACHINE SCREWS TO SUPPORT. DO NOT USE METAL BACKED TAPE |