Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: ENGINEERING - FINAL
Permit Number - T11CM01372
Inspection Description - ENGINEERING - FINAL
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2011 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O - ENSURE REMAINING CONSTRUCTION IS SEPARATED FROM THE PUBLIC. CALL FOR RE-INSPECTION | |
08/08/2011 | ENGINEERING - FINAL | Approved | ||
08/05/2011 | ENGINEERING - FINAL | Denied | 1) PROVIDE VERIFICATION THAT THE 6" ABS STORM DRAIN PIPE WAS INSTALLED PER YOUR APPROVED SITE PLAN. 2) CLEAN OUT INVERT OF PIPE AND CATCH BASIN , AND OUTLET CATCH BASIN IN ORDER TO ENSURE PIPE DRAINS PER DESIGN. 3) BRING EXISTING HC PARKING INTO CODE COMPLIANCE. ENSURE SIGNAGE MEETS CURRENT ANSI/ADAAG REQUIREMENTS |