Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PRE SLAB
Permit Number - T11CM01372
Inspection Description - PLUMBING - PRE SLAB
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/18/2011 | PLUMBING - PRE SLAB | Approved | IVRS - Inspection :* | |
05/16/2011 | PLUMBING - PRE SLAB | Not ready for Inspection | IVRS - Inspection :* 1) FLOOR SINK AND HAND SINK AT BUILT IN WARMERS 2) WET VENTING IS LIMITED TO VERTICAL DRAINAGE PIPING 3) VENT TO RISE A MINIMUM OF 6" ABOVE FLOOR RIM BEFORE OFF SETTING HORIZONTALLY 4) PROVIDE APPROVED HEALTH DEPT PLAN |