Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2011 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 10/14/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) ITEMS 1 & 2 DATED 10/7/11 HAVE BEEN CORRECTED, COMPLETE INSTALLATION OF REGISTERS FOR ABOVE CEILING APPROVAL |
|
| 10/07/2011 | MECHANICAL - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) ALL JOINTS IN DUCT WORK ARE TO BE SEALED PER MECH SPEC M4.1 GALVANIZED DUCT WORK 2) ALL CONDENSATE PIPING TO BE COPPER WITH 1/2" ARMAFLEX INSULATION PER MECH SPECS M4.1 CONDENSATE DRAIN PIPING 3) ALL CHANGES TO PLANS REQUIRE WRITTEN APPROVAL FROM ENGINEER |