Date Description Inspector Results Comments
04/02/2012 BUILDING PRE-SLAB Approved IVRS - Inspection :*
03/08/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) MAIN ENTRY AREA AND EAST OF SECURITY CLOSET OK TO POUR PROGRESS AREAS
03/07/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) LEVEL #1, DRAINAGE TRENCH; DETAIL #7, PAGE S.401 OK TO POUR PROGRESS AREA
03/01/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
02/29/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
02/27/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) GRADE LEVEL; POUR #3: 1-1.8/B-C OK TO POUR PROGRESS AREAS
02/23/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) GRADE LEVEL: GL 1/C-D; C/1-6 OK TO POUR PROGRESS AREAS
02/22/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) GRADE LEVEL-NORTH SECTION: GL A-B/1-5 OK TO POUR PROGRESS AREA
02/21/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
02/17/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) GRADE LEVEL GL: D-E/1-6 OK TO POUR PROGRESS AREA
02/15/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) SLABS FOR ROOMS #9-10; GRADE BEAM AT GL: 2/B-C; 4 COLUMN FOOTINGS FOR CANOPY AT 6/D.7; STAIRWELL FOOTING AT 6/D.7-D.8; 20 GRADE PANDREL SUPPORTS PER DETAIL #6, PAGE S-402 OK TO POUR PROGRESS AREAS
2) SHEARWALLS ON 5TH LEVEL-SPECIAL INSPECTED
02/02/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) RAMP FROM LEVEL 2 TO LEVEL 1 (SLAB ON GRADE) OK TO POUR PROGRESS AREA
02/01/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) LEVELS 5-2; STAIRWELL AREAS DETAIL ON PAGE S-103-REBAR AND MESH IN PLACE; LEVEL 5 GL: C.5-D; 1-6; LEVEL 4 DRAIN-DETAILS #9, 10 PAGE S-501 OK TO POUR PROGRESS AREAS
01/31/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) RAMP CURBS FROM LEVEL 2 TO LEVEL 1 OK TO POUR TOP HALF
01/30/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
01/27/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
01/26/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 5TH LEVEL GL: 1-6; A.5-B; 1-6, D-D.5 OK TO POUR PROGRESS AREAS
01/25/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 5TH LEVEL GL: D.7-E; 1-5 OK TO POUR PROGRESS AREA
2) NOTE: INSPECTION PERFORMED ON SLAB (NORTHEAST STAIRWELL) OF MEDICAL BLDG-PERMIT ?
3) OK TO POUR SLAB
01/24/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) RAMPS AT 4TH TO 3RD; 3RD TO 2ND-OK TO POUR PROGRESS AREAS
01/20/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 2ND LEVEL-GL: A-B, 6-1 OK TO POUR PRGROESS AREAS
01/19/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 3RD LEVEL GL: A-B; 1-6 OK TO POUR PROGRESS AREAS
2) NOTE: COLUMN FOOTING AT GL: M/1 (SPREAD FOOTING) 3) WEST WING OF HOSPITAL BLDG-OK TO POUR COLUMN AFTER UPDATE ON RFI
01/18/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 4TH LEVEL GL: 1-6; A-B OK TO POUR PROGRESS AREAS
01/17/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) GL: 1.5-6, A-A5, 1-6; B-6 OK TO POUR PROGRESS AREA
01/13/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 5TH LEVEL GL: 1-6; A-A.5; 1-6 B-C
01/12/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
01/11/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 2ND LEVEL GL: C-D; 1-6 OK TO POUR SLABS
01/10/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 3RD LEVEL AT GL: C-D; 1-6 1ST LEVEL GL: SOUTHEAST CORNER D-E; 4.8-6 OK TO POUR PROGRESS AREAS
01/09/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
1) CONTRACTOR CANCELLED
01/06/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) NORTHWEST STAIRWELL PAD; SOUTHEAST CORNER 1ST LEVEL; 4TH LEVEL GL: C1-D6 OK TO POUR PROGRESS AREAS
01/05/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 2ND LEVEL SOUTH PORTION GL: D1-E6 OK TO POUR
2) DRY PACK NORTH WEST SHEARWALLS, COLUMNS AT 1ST LEVEL
01/04/2012 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) 3RD FLOOR SOUTH HALF OK TO POUR
01/03/2012 BUILDING PRE-SLAB Not ready for Inspection IVRS - Inspection :*
12/30/2011 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
1) CANCELLED PER SUPER CHRIS BY PHONE CALL
12/27/2011 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
LEVEL #5 AT GRIDS D1 TO D5.8 OK TO POUR