Permit: T11CM01351

Parcel: 110120960


Addresses:

5301 E GRANT RD


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T11CM01351

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
04/02/2012 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
03/20/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) FOOTINGS FOR TIRE SHREADERS; DETAIL #7 PAGE S-402 OK TO POUR BASES
01/31/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) TRANSFORMER SLAB NORTH SIDE OF BLDG
2) DRAINS NEED TO BE IN PLACE
01/30/2012 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
12/23/2011 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - RI canceled
11/09/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 2 PIERS AND GRADE BEAM AT GL: 6/A.5 OK TO POUR PROGRESS AREAS
10/19/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) ELEVATOR EQUIPMENT ROOM FOOTINGS; DETAIL 4/102 PAGE S.402 OK TO POUR FOOTINGS
10/14/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) ELEVATOR PIT WALLS AT 5' 6" DETAIL #1/S2.01 PAGE S402; GRADE BEAM AT GL: B/2-5; 2/A.5-B; 5/A.5-B OK TO POUR GRADE BEAM AND ELEVATOR WALLS
10/13/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 3/B-C, B.75/2.5.3 OK TO POUR PROGRESS AREAS
10/12/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) ELEVATOR FOUNDATION-DETAILS #D/S101, PAGE S201; #1/S201 PAGE S.402: CAISSON COLUMNS #19C AND 20 C OK TO POUR PROGRESS AREAS
10/11/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) GRADE BEAM GL: E/5.7-6; MASONRY PIERS AT 1C, 2C, 51C, 52C, 53C, 27C, 32C OK TO POUR PROGRESS AREAS
10/07/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1) GL D/1.8 AND 4.8-2 GRADE BEAM FOOTERS
10/06/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 8 CASSION FOOTINGS #52C, 53C, 13C, 15C, 16C, 18C, 22C, 23C AND 25C OK TO POUR PROGRESS AREAS
NOTE:
IN LIEU OF CITY OF TUCSON INSPECTIONS ON 10/11; INSPECTIONS ON FOOTINGS #19C AND 20 C-NINYO & MORE SPECIAL INSPECTIONS MAYBE UTILIZED TO ADVANCE JOB PROGRESS OF SUBJECT FOOTINGS
10/05/2011 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
INFORMATION ONLY
10/04/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1 CAISSON FOOTING # 53C - OK TO POUR
10/03/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 5 CAISSION COLUMN FOOTINGS #1C, 2C, 51C, 8C, 9C, 52C AND 53C ARE NOT TO BE POURED AS OF THIS DATE 10/3/11: CAVE IN FROM 53C TO 52C FOOTINGS TO BE RE-EVALUATED ON NEXT INSPECTION
09/30/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 8 CAISSION COLUMN FOOTINGS: 3C, 4C, 5C, 6C, 7C, 11C, 14C, AND 17C OK TO POUR FOOTINGS
09/29/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 7 CAISSON FOOTINGS: 40C, 41C, 21C, 24C, 26C, 10C, 12C OK TO POUR PROGRESS FOOTINGS
09/28/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) CAISSON FOOTINGS #28C, 30C, 33C, 34C, 35C, 37C AND 27C OK
2) OK TO POUR PROGRESS AREAS
09/27/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) CAISSON FOOTINGS: 2 EACH DS-1 GL: D.5/6, D.5/1
2) 3 EACH DS-2, GL: D.7/5.5; D.8/6; D.7/6; 2 EACH DS-4 GL: D/1.8, 4.8; 2 EACH DS-6 GL: D/6; D/1: OK TO POUR PROGRESS AREAS
09/26/2011 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 3 EACH CAISSION FOOTINGS (DS-3) GL: 2-5/4.5; 2 EACH CAISSION FOOTINGS (DS-1) GL: E/5.8; D.6/6 OK TO POUR PROGRESS AREAS