Permit: T11CM01290

Parcel: 120052720


Addresses:

902 W IRVINGTON RD


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T11CM01290

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
09/21/2011 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
1) WATER TEST FOR 3" GW FLOOR SINK AND HAND SINK THRU CLEANOUT HEIGHT. DBL FIXTURE FITTING
09/20/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
09/14/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) LEAK REPAIR AT DELI FROM 9/13/11 INSPECTION FOR FLOOR SINK OK
09/13/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WOMEN'S RESTROOM OK
2) DELI WATER TEST TO 10', 2 FLOOR SINKS AND 2 HAND SINKS PER INITIAL P9.1
3) 1 FLOOR SINK CONNECTION TO EXISTING IS LEAKING, REPAIR AND PROVIDE RUN TEST ON SOUTH DRAINAGE
09/07/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WOMENS RESTROOM
2) SUPPORT COPPER STUB OUTS
3) ISOLATE ABS FROM METAL STUDS
4) REPLACE N/H BAND WITH SOLVANT WELD COUPLING
08/31/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) (5) FLOOR SINKS CAPPED UNDERGROUND INITIALED P D-1
08/25/2011 PLUMBING - ROUGH, SOIL Partial Approval FROM EXISTING THROUGH C/O & DRAIN FITTING TO 10' WATER TEST FOR SEAFOOD HAND SINK PER INITIAL P1.1
08/24/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
CANCELLED BY W.P.
08/23/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
2) FS-1 INITIAL P1.1 WATER TEST THEN C/O HEIGHT TO 10'
08/22/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :* CANCELLED BY W.D.
08/19/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST THRU C/O TO 10' AT NON-FOOD STORAGE
FLOOR SINK C/O
08/18/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) PROVIDE CORRECT APPROVED COUPLING ON EXISTING 2" ABS
2) TEST TO BE IN PLACE AT TIME OF INSPECTION
3) BE SURE TO KEEP ALL SANITARY OPENINGS TEMP. CAPPED
08/16/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WATE TEST PRODUCE PREP DETAIL B PAGE P9.1 TO 10'
08/15/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
08/10/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) I CALLED AND LEFT MESSAGE
2) UNABLE TO LOCATE CONTRACTOR AND WALKED THRU STORE & COULD NOT LOCATE WORK AREAS