Permit: T11CM01163

Parcel: 129071380

Inspection Status: Approved

Inspection History: BUILDING - PROGRESS

Permit Number - T11CM01163

Inspection Description - BUILDING - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
07/27/2012 BUILDING - PROGRESS Approved IVRS - Inspection :*
05/01/2012 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) POUR FOOTER ON NORTHEAST CORNER OF SLAB
2) CALL IN ALL OTHER INSPECTIONS
02/09/2012 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
ATTIC SEALED PER PREVIOUS NOTE #3 OK
EXCEPT REAR PORCH
02/07/2012 BUILDING - PROGRESS Not ready for Inspection IVRS - Inspection :*
NO ANSWER AT DOOR; BUILDING LOCKED UP
01/12/2012 BUILDING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) INSTALL R-8 INSULATION IN NON CONDITIONED SPACE
2) WRAP R-6 WITHIN R-2 TO MEET INTENT OF CODE IN ATTIC
3) SEAL ATTIC SPACE FOR CONDITIONED SPACE R-6 ACCEPTABLE
4) ANY 3 CHOICES ABOVE OR SUBMIT APPEAL TO BLDG OFFICIAL FOR OTHER METHODS
01/11/2012 BUILDING - PROGRESS Not ready for Inspection IVRS - Inspection :*
1) CANCELLED PER MATTHEW
12/09/2011 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) ALL ELECTRICAL OK
2) PROVIDE MINIMUM R-8 INSULATED FLEX DUCT PER CODE. R-6 INSTALLED
3) NO INSPECTION TO REAR PORCH AT THIS TIME
4) OK TO SHEETROCK
12/08/2011 BUILDING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SECURE WIRING AT JUNCTION BOX IN ATTIC
2) REMOVE SHEETROCK TO INSPECT NEW WORK (ELECTRICAL)
3) EXPOSE FOOTERS TO VERIFY DEPTH REAR PATIO
4) LAG BOLTS AT LEDGER 32" ON CENTER STAGGERED
10/24/2011 BUILDING - PROGRESS Not ready for Inspection IVRS - Inspection :*
1) COMPLY WITH PREVIOUS 6/2/11 INSPECTION
2) PROVIDE ATTIC ACCESS
07/27/2011 BUILDING - PROGRESS Not ready for Inspection IVRS - Inspection :*
06/03/2011 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
1) ROOF OK, COVER AT MAIN HOUSE
06/02/2011 BUILDING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SUBMIT NEW ELECTRICAL PLAN AS BUILT OR BUILD TO ORIGINAL PLAN
2) ALL OTHER WORK TO BE REPLACED LIKE FOR LIKE TO ORIGINAL PLAN
3) COMPLY WITH DIAPHRAM NAILING DETAIL 3 A-8