Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - PROGRESS
Permit Number - T11CM01163
Inspection Description - BUILDING - PROGRESS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/27/2012 | BUILDING - PROGRESS | Approved | IVRS - Inspection :* | |
05/01/2012 | BUILDING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) POUR FOOTER ON NORTHEAST CORNER OF SLAB 2) CALL IN ALL OTHER INSPECTIONS |
|
02/09/2012 | BUILDING - PROGRESS | Partial Approval | IVRS - Inspection :* ATTIC SEALED PER PREVIOUS NOTE #3 OK EXCEPT REAR PORCH |
|
02/07/2012 | BUILDING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* NO ANSWER AT DOOR; BUILDING LOCKED UP |
|
01/12/2012 | BUILDING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL R-8 INSULATION IN NON CONDITIONED SPACE 2) WRAP R-6 WITHIN R-2 TO MEET INTENT OF CODE IN ATTIC 3) SEAL ATTIC SPACE FOR CONDITIONED SPACE R-6 ACCEPTABLE 4) ANY 3 CHOICES ABOVE OR SUBMIT APPEAL TO BLDG OFFICIAL FOR OTHER METHODS |
|
01/11/2012 | BUILDING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER MATTHEW |
|
12/09/2011 | BUILDING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) ALL ELECTRICAL OK 2) PROVIDE MINIMUM R-8 INSULATED FLEX DUCT PER CODE. R-6 INSTALLED 3) NO INSPECTION TO REAR PORCH AT THIS TIME 4) OK TO SHEETROCK |
|
12/08/2011 | BUILDING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SECURE WIRING AT JUNCTION BOX IN ATTIC 2) REMOVE SHEETROCK TO INSPECT NEW WORK (ELECTRICAL) 3) EXPOSE FOOTERS TO VERIFY DEPTH REAR PATIO 4) LAG BOLTS AT LEDGER 32" ON CENTER STAGGERED |
|
10/24/2011 | BUILDING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* 1) COMPLY WITH PREVIOUS 6/2/11 INSPECTION 2) PROVIDE ATTIC ACCESS |
|
07/27/2011 | BUILDING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
06/03/2011 | BUILDING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) ROOF OK, COVER AT MAIN HOUSE |
|
06/02/2011 | BUILDING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SUBMIT NEW ELECTRICAL PLAN AS BUILT OR BUILD TO ORIGINAL PLAN 2) ALL OTHER WORK TO BE REPLACED LIKE FOR LIKE TO ORIGINAL PLAN 3) COMPLY WITH DIAPHRAM NAILING DETAIL 3 A-8 |