Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/25/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CORRECT DRAINAGE FOR INDIRECT DRAINS AT SODA AREA 2) PROVIDE BACKFLOW PROTECTION FOR ICE MACHINE 3) PROVIDE FACTORY TAPPED CLEANOUT PLUGS WITH MACHINE SCREWS 4) PROVIDE CORRECT 3-COMP SINK DRAINAGE AND VENT FOR FLOW CONTROL NOTE: NO SYSTEM VENT BETWEEN FLOW CONTROL AND INTERCEPTOR 5) MAKE ALL FIXTURES WATER TIGHT |