Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/04/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SEAL GAS PIPE PENETRATION THRU WALL 2) PROVIDE SEPERATE DRAINS FOR ICE MALLON & STORAGE AT ICE MACHING AND SECURE DRAIN PIPING WITH 1 1/2 AIR GAP 3) COMPLETE WATER HEATER HOT PIPING INSULATION 4) PERM CAP UNUSED WATER SUPPLIES & INSTALL ALL BORDING EQUOIP 5) SECURE FOUNTAIN DISPENSER DRAIN 6) ACESSABLE TOILET TO HVE FLUSH VALVE HANDLE TO WIDE SIDE OF STALL 7) FLOOR DRAINS TO BE FLUSH WITH FINISH FLOOR IN RESTROOM TO PREVENT TRIPPING HAZARDS STERILIZATION & BACTERIA REPORTS WITH BACKFLOW CERIFICATION ON SITE |