Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T11CM01094
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Not ready for Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) PLAN REQUIRED TO BE ON SITE AT ALL TIMES 2) DWV WITH TEST THRU ROOF OK, NEEDS SUPPORTS 3) WATER PIPING NOT PER PLAN; SIZE AND MATERIAL TYPE 4) PROVIDE A CITY APPROVED ISOMETRIC DRAWING OF WATER SYSTEM 5) PROVIDE APPROVED PIPING SUPPORTS FOR PEX 6) IECC REQUIRES 1" THICK INSULATION ON RECIRCULATING SYSTEMS |
|
| 08/24/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 07/21/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |