Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2011 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 04/01/2011 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) T & P DRAIN TO TERMINATE TO DAYLIGHT. DO NOT USE COLD WATER PVC 2) PROVIDE A TRACER (YELLOW) WIRE WITH ALL PLASTIC PIPE IN TRENCH 3) NEED TO SEE 12" OF CLEAN FILL AND A FRIM BED OF CLEAN FILL 4) PROVIDE A MINIMUM 10 POUND TEST ON ALL GAS PIPING |