Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/07/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/06/2011 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/01/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION, AND AT THE END OF BRANCHES. THEN, NO MORE THAN FOUR FEET BETWEEN HANGERS 2) ISOLATE ABS FROM METAL STUDS 3) SUPPORT ALL HORIZONTAL PIPING 4) DEMO'D PIPING CAPPED OFF OK 5) OK TO COVER UNDERGROUND |