Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2011 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/17/2011 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) PROVIDE MATERIAL SCHEDULE, INCLUDE DWV, WATER, GAS, ETC... 2) IF ABS DWV SCHEDULE 40 IS INCLUDED AS AN APPROVED MATERIAL OK TO COVER |