| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/13/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NOTE #3 REQUIRES THAT WHEN COMBINED THE CROSS SECTIONAL AREA OF THE (2) 3/4" PIPES BE COMBINED INTO (1) PIPE THAT MEETS 2 X 3/4" CROSS SECTIONAL AREA OR BE 2 SEPERATE 3/4" FULL SIZE DRAINS |
|
| 05/18/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROPERLY SEAL INSULATION AND PROTECT INSULATION FROM SUN EXPOSURE 2) ROOF FLASHINGS TO BE MADE WEATHER TIGHT AT CONDUIT PENETRATIONS 3) T & P PRESSURE RELIEF DRAINS THAT CAN GRAVITY DRAIN TO DAY LIGHT SHALL GRAVITY DRAIN TO DAY LIGHT |
|
| 05/16/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |