Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - HYDRONIC PIPING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2011 | MECHANICAL - HYDRONIC PIPING | Approved | IVRS - Inspection :* | |
| 06/20/2011 | MECHANICAL - HYDRONIC PIPING | Partial Approval | IVRS - Inspection :* 1) HYDRO TEST AT 100 PSI PLUS OK |
|
| 06/16/2011 | MECHANICAL - HYDRONIC PIPING | Not ready for Inspection | IVRS - Inspection :* 1) HYDONIC PRESSURE TEST IS TO BE 1 1/2 TIMES OPERATING PRESSURE OR 100 PSI WHICH EVER IS GREATER, TEST IS TO BE WITH WATER NOT AIR 2) DUCT ABOVE HARD LIDS 100D AND 100E OK TO COVER |