Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T11CM00733
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2011 | ENGINEERING - FINAL | Approved | CHANGES MADE TO HC PEDESTRIAN ACCESS FROM CAMPBELL AND SPEEDWAY - DRAWING ON SITE REFLECT CHANGES MADE | |
09/14/2011 | ENGINEERING - FINAL | Partial Approval | 1) CONTRACTOR IS GOING TO REPLACE THE PEDESTRIAN ACCESS FROM SPEEDWAY AND CAMPBELL TO BRING ACCESS INTO COMPLIANCE WITH ADA. 2) THE ARCHITECT IS GOING TO REVISE THE PLANS TO SHOW CHANGES MADE TO THE SITE. 3) CALL FOR RE-INSPECTION WHEN COMPLETED. |
|
09/07/2011 | ENGINEERING - FINAL | Partial Approval | 1) PEDESTRIAN ACCESS FROM SPEEDWAY (N) AND CAMPBELL (E) DO NOT MEET ADA/ANSI REQUIREMENTS FOR ACCESSIBILITY AND SLOPES, ( > 10% AND > 12.5% RESPECTIVELY), DO NOT MATCH WHAT IS SHOWN ON THE APPROVED PLAN. 2) PROVIDE A PLAN THAT SHOWS THE EXISTING SLOPES OF SIDEWALKS AND HC ACCESS RAMPS FROM SPEEDWAY AND CAMPBELL OR INSTALL SIDEWALKS AND RAMPS THAT REFLECT WHATS SHOWN ON THE APPROVED PLAN. |
|
08/19/2011 | ENGINEERING - FINAL | Denied | NOT READY | |
08/18/2011 | ENGINEERING - FINAL | Denied |