Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/26/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/25/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE VACUUM BREAKERS FOR NEW HOSE BIBS 2) REGULATOR VENT FOR EXISTING GAS SYSTEM TO BE 5' FROM OPENABLE WINDOW OR DOOR WITH WEATHER 90 DEGREE AND SCRREN IN VENT TERMINATION |
|
| 04/27/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) THE VENT FOR THE REGULATOR ON THE 2 1/2" LINE AT THE MOTOR REQUIROS MINIMUM 5' CLEARANCE FROM OPENABLE DOOR OR IGNITATION SOURCES WITH SCREEN IN TERMINATION |