Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2012 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 03/16/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE THE PROPER STRUCTURAL DRAWING FOR NEW A/C UNIT ON THE ROOF. THE DRAWING PROVIDED HAS NO INFORMATION 2) SLEEPERS MUST SPAN THE ROOF JOINTS 3) PAINT ALL EXPOSED PVC WITH LATEX PAINT AND SUPPORT EVERY 4' 4) PROVIDE MINIMUM 2" R8 DUCT LINER IN ALL EXPOSED DUCT ON ROOF |