Permit: T11CM00616

Parcel: 117043440


Addresses:

550 N 5TH AV 10


Inspection Status: Approved

Inspection History: BUILDING - PROGRESS

Permit Number - T11CM00616

Inspection Description - BUILDING - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
07/17/2012 BUILDING - PROGRESS Approved
05/08/2012 BUILDING - PROGRESS Partial Approval
04/13/2012 BUILDING - PROGRESS Partial Approval
04/05/2012 BUILDING - PROGRESS Partial Approval
03/08/2012 BUILDING - PROGRESS Partial Approval
03/01/2012 BUILDING - PROGRESS Partial Approval
02/16/2012 BUILDING - PROGRESS Partial Approval
02/10/2012 BUILDING - PROGRESS Partial Approval
02/03/2012 BUILDING - PROGRESS Partial Approval
01/31/2012 BUILDING - PROGRESS Partial Approval
01/31/2012 BUILDING - PROGRESS Partial Approval
01/20/2012 BUILDING - PROGRESS Partial Approval
01/06/2012 BUILDING - PROGRESS Partial Approval
12/15/2011 BUILDING - PROGRESS Partial Approval
12/07/2011 BUILDING - PROGRESS Partial Approval MEETING WITH CECO AND SEAN AUBREY TO DISCUSS DISCREPANCIES
12/06/2011 BUILDING - PROGRESS Partial Approval
12/01/2011 BUILDING - PROGRESS Partial Approval
11/18/2011 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/16/2011 BUILDING - PROGRESS Partial Approval IVRS - Inspection :*
11/10/2011 BUILDING - PROGRESS Partial Approval
11/09/2011 BUILDING - PROGRESS Partial Approval water barrier south side ok. progress on backfill with gravel ok
11/07/2011 BUILDING - PROGRESS Partial Approval PROGRESS ON BACKFILL OK
11/03/2011 BUILDING - PROGRESS Partial Approval
10/20/2011 BUILDING - PROGRESS Partial Approval
09/29/2011 BUILDING - PROGRESS Partial Approval PREINSPECTION OF SCAFFOLDING OK. WORK STILL NEEDS TO BE DONE WITH CROSS BRACING AND AT LEADING EDGE
09/22/2011 BUILDING - PROGRESS Partial Approval
09/07/2011 BUILDING - PROGRESS Partial Approval NEED TO WATERPROOF WALLS BEFORE BACK FILL.
08/01/2011 BUILDING - PROGRESS Partial Approval
07/27/2011 BUILDING - PROGRESS Partial Approval SHOTCRETE DONE TO -15' E,W,N
07/26/2011 BUILDING - PROGRESS Partial Approval EXCAVATION STARTED TO -20'. DRILLING ON EAST SIDE.
07/22/2011 BUILDING - PROGRESS Partial Approval PROGRESS ON RETAINING WALL
07/21/2011 BUILDING - PROGRESS Partial Approval
07/20/2011 BUILDING - PROGRESS Partial Approval PROGRESS ON 3RD DROP. REPAIR AT NW CORNER OK. ADDITIONAL PINS NOT INSTALLED YET, RESPONSE FROM EOR NOT RECIEVED CONCERNING TIE-BACKS, NO PULL TESTS DONE ON WEST WALL
07/19/2011 BUILDING - PROGRESS Partial Approval PROGRESS ON SITE OK. HARK BEGUN USING OPEN HOLE METHOD AGAIN. TIE-BACKS AT EXISTING WALL NON-CONFORMING TO PLANS (DIAMETER AND DEPTH), AFI REQUIRED FROM ENGINEER.
07/14/2011 BUILDING - PROGRESS Partial Approval MET WITH SPECIAL INSPECTOR ON SITE. PROGRESS OK, BUT REPAIRS NOT STARTED
07/01/2011 BUILDING - PROGRESS Partial Approval ARRIVED AT 7am ON SITE TO FIND HARK DRILLING PLACING SHOTCRETE WITHOUT SPECIAL INSPECTOR. FOREMAN WAS TOLD TO SHUT DOWN PLACEMENT OF SHOTCRETE UNTIL INSPECTOR WAS ON SITE. HARK FOREMAN REFUSED TO SHUT DOWN WHEREUPON I LEFT SITE AND NOTIFIED CEI & EAGLE ROCK PROJECT MANAGERS THAT SITE WAS NOW UNDER A STOP-WORK ORDER. SEE DOCUMENTS IN SIRE.
06/30/2011 BUILDING - PROGRESS Partial Approval ARRIVED ON SITE TO FIND HARK DRILLING PLACING SOIL NAILS AND GROUTING IN A SINGLE METHOD (SACRIFICAL BIT LEFT ON GROUT RODS, WATER PRESSURE & BIT BEING USED TO DRILL TO 30', THEN NEAT CEMENT PUMPED INTO PILE UNTIL ALL WATER DISPLACED FROM PILE) . NO SUPERINTENDENTS ON SITE SO DISCUSSION HELD WITH HARK FOREMAN CONCERNING DEVIATION FROM APPROVED PLANS, AND LACK OF SPECIAL INSPECTION. FOREMAN STATED THAT THEY "SELF INSPECT" WHEREUPON I INFORMED HIM FOR THE 3RD TIME THAT 3RD PARTY INSPECTION WAS REQUIRED, AND THAT IF INSPECTIONS WERE NOT PUT IN PLACE THEN JOB WOULD HAVE TO BE SHUT DOWN; HE SAID HE WOULD CONTACT HIS BOSSES.
06/29/2011 BUILDING - PROGRESS Partial Approval ARRIVED ON SITE AFTER WORK FORCE HAD ALREADY LEFT. WORK HAS CONTINUED FOR NAIL PLACEMENT ON EAST AND NORTH WALL DOWN TO 10'. COULD NOT VERIFY IF SPECIAL INSPECTIONS HAD BEEN PERFORMED
06/28/2011 BUILDING - PROGRESS Partial Approval MET WITH SUPER ON SITE TO DISCUSS WHAT HAD BEEN DONE AS FAR AS SPECIAL INSPECTIONS. I WAS INFORMED THAT EAGLE ROCK HAD TAKEN CARE OF EVERYTHING. WITNESSED SOME DRILLING AND PLACEMENT OF #8 RODS, AGAIN INFORMED FOREMAN OF HARK & MILTON THAT GROUTING OF NAILS AND PLACEMENT OF SHOTCRETE WOULD REQUIRE CONTINUOUS INSPECTION.
06/27/2011 BUILDING - PROGRESS Partial Approval MET WITH SUPERINTENDENT FOR CEI "MILTON" ON SITE. HARKS DRILLING IS INSTALLING SOIL NAILS. INFORMED MILTON THAT SPECIAL INSPECTION WAS REQUIRED FOR ALL SOIL NAIL AND SHOTCRETE PLACEMENT; ALSO REQUESTED PLANS FOR COT REVIEW OF SHOTCRETE WALL.