Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2011 | PLUMBING - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 05/13/2011 | PLUMBING - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* 1) POST YOUR SUITE NUMBER 2) SEE NOTE FROM 4/18/11-LAV CARRIER SPECIFIED 3) BACKING AT MOP SINK COVERED 40 ONLY 1/3 OF THE DEVELOPED ALLOWABLE LENGTH OF A VENT TO BE INSTALLED IN THE HORIZONTAL POSITION |
|
| 04/18/2011 | PLUMBING - ABOVE CEILING | Partial Approval | IVRS - Inspection :* |