Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2011 | MECHANICAL - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 03/23/2011 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : DENIED- PROVIDE A 15LB PRESSURE GAUGE, PROVIDE THE ROOFTOP DRAWING. |
|
| 03/04/2011 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A PRESSURE TEST ON ALL GAS PIPING TO UNIT ON ROOF 2) FITTINGS ARE TO NUMEROUS FOR A SOAP TEST 3) PROVIDE THE REQUIRED STRUCTURAL DRAWING FOR A NEW A/C ON THE ROOF 4) I.D. THE CIRCUIT BREAKER FOR THE SERVICE RECEPT, MUST NOT EXCEED 20 AMP |
|
| 02/28/2011 | MECHANICAL - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |