Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/24/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) FLASHINGS FOR SOLAR LOOP PIPING TO BE PROPERLY INSTALLED WITH CORRECT UNDER AND OVER LAP OF TILES. MADE WEATHER TIGHT 2) FRAME WORK FOR PANEL TO BE PROPERLY SECURED TO ROOF, BOLTS THRU ROOF TO BE WEATHER TIGHT AT ROOF AND TILES 3) PROVIDE A PROTECTION POLE OR BARRIER FOR STORAGE TANK |