Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2011 | MECHANICAL - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/03/2011 | MECHANICAL - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) ALL PVC PIPE AND FITTINGS ARE TO HAVE PRIMERED JOINTS PRIO TO GLUE, PRIMER IS TO BE PURPLE IN COLOR PER U.P.C. 2) ALL PVC EXPOSED TO DAYLIGHT IS TO BE COATED FOR U.V. PROTECTION 3) BLOCKING ON PVC PIPE NOT TO EXCEED 48" 4) CONDENSATE PIPING IS TO TERMINATE WITHIN 6" OF GRADE 5) ELECTRIC CONDUIT IS TO BE BLOCKED UP OFF ROOF MINIMUM 1.5" 6) SERVICE OUTLET IS TO BE PROVIDED ON ROOF WITHIN 25' OF UNIT 7) UNIT DATA PLATE NOT PROPERLY IDENTIFIED 8) ALL DUCT WORK EXPOSED TO EXTERIOR OF BLDG OR WITHIN VENTED ATTIC SPACE OR OTHERWISE OUTSIDE OF BLDG THERMAL ENVELOPE IS TO HAVE AN R-VALVE OF AT MINIMUM 8 (2" DUCT LINER) |
|
| 04/26/2011 | MECHANICAL - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |