Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - YARD WTR LINE/TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2011 | PLUMBING - YARD WTR LINE/TEST | Approved | IVRS - Inspection :* | |
| 06/13/2011 | PLUMBING - YARD WTR LINE/TEST | Not ready for Inspection | IVRS - Inspection :* 1) 1 1/2" PVC CONTINUATION TO RPB AND METER LOCATION STUB UP ONLY 2) HAVE YOUR CIVIL PLAN APPROVED BY CITY OF TUCSON PLAN CHECK BY ROBER SHERRY ON SITE 3) NEED TO SEE METER THRU TO RPB AND TIE IN 4) 3/4" PVC FROM BLDG EXTERIOR TO WEST STUB AT R.O. UNIT 5) THIS NEEDS TO BE SHOWN ON A CITY APPROVED PLAN CHECKED PLAN |
|
| 05/18/2011 | PLUMBING - YARD WTR LINE/TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 05/17/2011 | PLUMBING - YARD WTR LINE/TEST | Partial Approval | IVRS - Inspection :* 1) 1 1/2" CW AND 3/4 CW LOOPED UNDERGROUND 2' EXTERIOR PER PLAN 2) PROVIDE TRACER WIRE FOR PVC |