Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 09/23/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 06/24/2011 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SECURE GAS PIPING CLOSE TO APPLIANCE SHUT OFF VALVE 2) TEST PIPING AT 10 PSI WITH A 15 POUND GAUGE 3) THE GAUGE WILL BE REMOVED PRIOR TO CONNECTING GAS TO APPLIANCE 4) GAS SUPPLY PIPING IS UNDERSIZED AND NOT INSTALLED PER YOUR APPROVED PLAN, AS PREVIOUSLY NOTED 5) PROVIDE CORRECTLY SIZED AND INSTALLED PIPE CLAMPS 6) CONTRACTOR SHALL PAY REINSPECTION FEE FOR FAILURE TO COMPLY WITH PREVIOUSLY NOTED CORRECTIONS |
|
| 02/25/2011 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUM CLEARANCE BETWEEN FLUE PIPE AND COMBUSTIBLES AND INSULATION 2) SEAL/WEATHER STRIP BEDROOM DOOR, INSTALL THRESHOLD 3) SECURE ALL PIPING AND WATER HEATER PAN 4) INSTALL MIXING VALVE ON DOMESTIC HOT WATER TO HOME, AFTER HEATER 5) CORRECT THE COVER OBSTRUCTING THE COMBUSTION AIR OPENINGS 6) SECURE ALL TUBING SO AS NOT TO COMPRESS PIPE INSULATION 7) PROTECT ROOF FROM SHARP STRUT AND SECURE WITH MASTIC 8) RELIEF VALVE DRIPPING 9) GAS NOT INSTALLED PER PLAN. ALSO THIS MUCH GAS PIPING WILL REQUIRE A PRESSURE TEST |