Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T11CM00103

Parcel: 12201024J


Addresses:

3920 E GRANT RD


Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T11CM00103

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/09/2011 PLUMBING - FINAL Approved IVRS - Inspection :*
08/04/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
BACKFLOW CONTS REQUESTED ON 6/16, 6/30,7/29 AND 8/1.
ELECTRICAL CONNECTION NOTES ON 6/22 FOR RELOCATED & REPLACED WATER HEATER
PATCH HOLE IN PIPE WALL ABOVE PRODUCE
COMPLETE OVERHEAD PIPING CORRECTIONS
08/03/2011 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
08/02/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) CAP OR REMOVE HB AT OLD ? CONNECTION
2) PROVIDE A RIGID TERMINATION WITH A 1" AIR GAP AT DRAIN
3) SECURE ALL TUBING AT RO
4) INSTALL BACKFLOW PROTECTION ON MISTING SYSTEM AS NOTED ON PLAN
5) ALL BACKFLOW ASSEMBLIES REQUIRE A CERTIFICATION TEST AT TIME OF INSTALLATION AND EACH YEAR THEREAFTER
6) SUPPORT PEX OVER HEAD WITH APPROVED SUPPORTS
7) TRAFFIC RATED CLEANOUT COVERS OR CONCRETE
07/29/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
07/29/2011 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
1) PREPARE FOR AND SCHEDULE ABOVE CEILING INSPECTIONS
2) COMPLETE ? PIPING AND CONNECTIONS WITH BACKFLOW PREVENTIONS FOR MISTING SYSTEM
3) RED LINE ALL CHANGES MADE ON APPROVED PLANS
4) BEVERAGE EQUIPMENT DRAINS AND WATER SUPPLY REQUIRE SUPPORTS AND AIR GAPS
5) ID ALL BACKFLOW ASSEMBLIES, PROVIDE CERTS FOR ALL NEW BACKFLOW ASSEMBLIES
6) TRAP AND TRAP ARM SHALL BE THE SAME SIZE, PROVIDE A FACTORY 'P' TRAP AND APPROVED DRAINAGE FITTINGS
7) EACH FIXTURE REQUIRES SEPERATE SOVS, DO NOT LINK FLEXES
8) RELIEF VALVE TERMINATION TO BE VERTICAL
9) PROTECT PLASTIC VTRS-COMPLETE ANY REMAINING ITEMS
10) CLEANOUT COVERS
06/30/2011 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) REMOVE BRANCH TAIL PIECE AT LAV. PROVIDE BACKFLOW CERTS
06/29/2011 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) RP SHALL BE INSTALLED AT MAX 5' ABOVE FLOOR 603.34, CORRECT THEN TEST. YOU MAY USE THE WATER
2) NEW SUPER IS GINO
06/28/2011 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) BACKFLOW PREVENTION ASSEMBLIES REQUIRE ACCESS AS PRESCRIBED BY CODE UPC 603.3.4
2) CERTIFICATION TEST PER SEC 603.1
06/24/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
06/22/2011 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) WATER HEATER REQUIRES TANK, VAC RELIEF VALVE, RELIEF VALVE MAY NOT COMBINE WITH PAN DRAIN, BOTH DRAINS REQUIRE READY ACCESS AT TERMINATION POINT
2) CORRECT ELECTRICAL
3) TD SIZE CORR OK
06/16/2011 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) COMPLETTE WORK IN TOILET ROOMS AND ABOVE
2) NOTE: BACKFLOW PREVENTION ASSEMBLY REQUIRES A CERT TEST. (TOILET ROOMS)
3) LISTED CLEANOUT PLUGS TO ? SCREWS FROM COVER
05/25/2011 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) A FINAL INSPECTION OF THE TOILET ROOMS IS REQUIRED PRIOR TO USE
2) CORRECT LEAKS AND PROVIDE ACCESS